Brentwood Borough Council Planning and Building Control - Local Plan Examination - Doc...

Brentwood Borough Council Planning and Building Control - Local Plan Examination - Doc...

Quick Links

Skip Navigation | Home page | Site map | Search | Help | Complaints procedure | Disclaimer | Feedback | Access key details
Brentwood Borough Council

Breadcrumb, my location

Document Library

 

A. Core Submission Documents

ReferenceDocumentDateAuthor
A1Brentwood Pre Submission Local PlanFebruary 2019Brentwood Borough Council
A2Addendum of Focussed Changes to the Pre Submission Local PlanOctober 2019Brentwood Borough Council
A3Sustainability Appraisal of the Pre Submission Local PlanJanuary 2019Aecom
A4Sustainability Appraisal of the Addendum of Focussed Changes to the Pre Submission Local PlanOctober 2019Aecom
A5Habitats Regulations Assessment of the Brentwood Pre Submission Local PlanJanuary 2019Aecom
A6Habitats Regulations Assessment of the Addendum of Focussed Changes to the Pre Submission Local PlanOctober 2019Aecom
A7

Consultation Statement for the Brentwood Pre Submission Local Plan Regulation 22(c) Statement

Main Report | Annex B | Annex C | Annex D | Annex E | Annex F | Annex G | Annex H | Annex I

February 2020Brentwood Borough Council
A8Proposed Changes to Policies MapFebruary 2020Brentwood Borough Council
A9Equalities Impact AssessmentFebruary 2020Brentwood Borough Council
A10Health Impact AssessmentFebruary 2020Brentwood Borough Council
A11Duty to Cooperate StatementFebruary 2020Brentwood Borough Council
A12

Representations on the Brentwood Pre Submission Local Plan

Further details on representations can be viewed on the Consultation Portal

February 2020Brentwood Borough Council
A13

Representations on the Addendum of Focussed Changes to the Pre Submission Local Plan

Further details on representations can be viewed on the Consultation Portal

February 2020Brentwood Borough Council
A14

Statement of Community Involvement

Part 1 | Part 2

December 2018Brentwood Borough Council
A15Formal request for consideration of modificationsFebruary 2020Brentwood Borough Council

 

B. Previous Stages

ReferenceDocumentDateAuthor
 Regulation 18 Brentwood Core Strategy Issues and Options  
B1Core Strategy Issues and OptionsNovember 2009Brentwood Borough Council
B2Core Strategy Issues and Options Sustainability AppraisalNovember 2009Scott Wilson
 Regulation 18 Brentwood Local Plan Preferred Options  
B3Brentwood Local Plan 2015-2030 Preferred OptionsJuly 2013Brentwood Borough Council
B4

Preferred Options Supporting Documents

Draft Policies Map | Individual Site Allocations

July 2013Brentwood Borough Council
B5Sustainability Appraisal (SA) of the Brentwood Borough Local Plan: Interim SA ReportAugust 2013URS
B6Sustainability Appraisal (SA) of the Brentwood Borough Local Plan: Scoping ReportAugust 2013URS
 Regulation 18 Brentwood Strategic Growth Options  
B7Strategic Growth Options ConsultationJanuary 2015Brentwood Borough Council
B8Sustainability Appraisal (SA) of the Brentwood Borough Local Plan: Interim SA ReportJanuary 2015URS
 Regulation 18 Brentwood Draft Local Plan  
B9Brentwood Draft Local PlanJanuary 2016Brentwood Borough Council
B10

Draft Plan Supporting Documents

Pattern Book | Site Allocations Maps

January 2016Brentwood Borough Council
B11Draft Local Plan Interim Sustainability AppraisalFebruary 2016Aecom
 Regulation 18 Brentwood Draft Local Plan Preferred Site Allocations  
B12Brentwood Draft Local Plan: Preferred Site AllocationsJanuary 2018Brentwood Borough Council
B13Draft Local Plan: Preferred Site Allocations Interim Sustainability AppraisalJanuary 2018Aecom
B14

Habitats Regulations Assessment of Draft Local Plan: Preferred Site Allocations

Main Report | Figure B1 | Figure B2

January 2018Aecom
 Regulation 19 Brentwood Pre-Submission Local Plan  
B15Statement of Representations Procedure and Availability of DocumentsFebruary 2019Brentwood Borough Council

 

C. Evidence

ReferenceDocumentDateAuthor
 Borough Profile  
C1Brentwood Borough ProfileFebruary 2019Brentwood Borough Council
 Culture, Tourism and Leisure  
C2Green Infrastructure StrategySeptember 2015Groundwork South
C3Built Facilities Strategy Full AnalysisOctober 20184global Consulting
C4Playing Pitch Strategy 2018-2033November 20184global Consulting
C5Golf course needs assessmentOctober 2018Brentwood Borough Council
C6

Open space, sport and leisure needs assessment

Final report | Appendices | Appendix 12

August 2016Ploszajski Lynch Consulting Ltd
C7Hotel and Visitor Accommodation Futures StudyApril 2008Hotel Solutions
 Design  
C8Brentwood Town Centre Design GuideNovember 2019Levitt Bernstein
C9

Brentwood Town Centre Design Plan and Feasibility Studies

Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Appendix A | Appendix B

November 2017Levitt Bernstein
C10Brentwood Town Centre Regeneration StrategyMay 2010The Essex Design Initiative
C11Dunton Hills Garden Village Day in the Life ScenariosFebruary 2020Brentwood Borough Council
 Economy and Employment  
C12Economic Futures 2013-2033January 2018Lichfields
C13

Employment Land Review

Final Report | Business Survey | Map A1 | Map A2 | Map A7 | Map A8 | Map A9 | Map A10 | Table E1 | Table E2 | Table E3 | Table E4 | Table E5 | Table E6 | Table E7 | Table F2 | Map of Brentwood

September 2010Atkins
C14

Retail and Commercial Leisure Study

Final Report | Executive Summary

December 2014Nathaniel Lichfield & Partners
 Flooding  
C15

Surface Water Management Plan

Final Report | Executive Summary | Appendix B | Appendix C | Appendix D | Appendix E | Appendix F | Appendix G | Appendix H | Appendix I | Appendix J | Appendix K

January 2015Essex County Council
C16

Strategic Flood Risk Assessment

Main report | Appendix A | Appendix B | Appendix C | Appendix D | Appendix E

November 2018Amec Foster Wheeler
C17Water Cycle StudyNovember 2018Amec Foster Wheeler
 Green Belt  
C18

Green Belt Study

Part 1 London Metropolitan Green Belt overview | Part 2 Green Belt parcel definition and review | Part 3 Assessment of potential housing, employment and mixed use sites | Part 3 Appendix L1, Part 3 Appendix L2 | Part 3 Appendix L3 | Part 3 Appendix L4 | Part 3 Appendix L5 | Part 3 Appendix L6 | Part 3 Appendix L7 | Part 3 Appendix L8

November 2018Crestwood Environmental Ltd
 Housing and Demography  
C19Strategic Housing Market Assessment (SHMA) Part 1October 2018Peter Brett Associates
C20Strategic Housing Market Assessment (SHMA) Part 2 Objectively Assessed Need for Affordable HousingJune 2016HDH Planning and Development Ltd
C21

Greater Essex Demographic Forecasts 2012-2037

Phases 1 and 2 (March 2012) | Phase 3 (July 2012) | Phase 4 (January 2013) | Phase 5 (April 2014) | Phase 6 (September 2014) | Phase 7 (May 2015)

March 2012 – May 2015Edge Analytics
C22Heart of Essex Housing Growth ScenariosJune 2012Edge Analytics
C23

Brentwood Gypsy and Traveller Accommodation Assessment (GTAA)

Original Report | Updated Report

October 2017Opinion Research Services
C24Housing and Economic Land Availability Assessment (HELAA)October 2018Brentwood Borough Council
C25

Site Assessment Methodology and Summary of Outcomes

Main Report | Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8

January 2018Brentwood Borough Council
C26Site Analysis overviewFebruary 2019Brentwood Borough Council
C27

Strategic Housing Land Availability Assessment (SHLAA)

Final Report | Map south east | Map south west | Map central east | Map central west | Map north east | Map north west | Map Brentwood town north west | Map Brentwood town north east | Map Brentwood town south east | Map Brentwood town south west | Map Ingatestone | Map West Horndon | Map Blackmore | Map Doddinghurst | Map Herongate and Ingrave | Map Hook End & Wyatts Green | Map Kelvedon Hatch | Map Pilgrims Hatch | Map Stondon Massey and Tipps Cross

October 2011Atkins
 Infrastructure  
C28

Infrastructure Delivery Plan

0. Control Sheet | 1. Introduction | 2. Development Typology | 3. Transport | 4. Energy | 5. Water and Drainage | 6. Waste | 7. Broadband and Mobile Technology | 8. Education | 9. Social and Community | 10. Health | 11. Sport | 12. Heritage | 13. Emergency Services | 14. Green Infrastructure | 15. Overcoming the Funding Gap | Part B Schedule

February 2020Brentwood Borough Council
 Natural Environment  
C29Protected Lanes AssessmentMarch 2016Place Services
C30Protected Lanes Assessment review letterOctober 2018Place Services
C31

Local Wildlife Site Review

Final Report | Annex

December 2012Essex Ecology Services Ltd
C32

Landscape Sensitivity and Capacity Study

Main report | Appendix L1 | Appendix L2 | Appendix L3 | Appendix L4 | Appendix L5 | Appendix L6 | Appendix L7

October 2018Crestwood Environmental Ltd
C33

Mid Essex Landscape Character Assessment

Contents, preface and executive summary | Introduction | Overview of the study area | Braintree | Brentwood | Chelmsford | Maldon | Uttlesford | Recommendations

September 2006Chris Blandford Associates
 Renewable Energy  
C34

Renewable Energy Study

Final Report | Executive Summary

April 2014University of Exeter
 Transport  
C35

Transport Assessment

Main report | Appendix A | Appendix B | Appendix C | Appendix D | Appendix E | Appendix F | Appendix G | Appendix H | Appendix I | Appendix J | Appendix K

January 2020Stantec
C36Brentwood Borough Cycling Action PlanMarch 2018Essex Highways
C37South Brentwood Growth Corridor Sustainable Transport VisionFebruary 2020DUP
 Viability  
C38Local Plan Viability AssessmentOctober 2018HDH Planning and Development

 

D. Monitoring and Local Development Scheme

ReferenceDocumentDateAuthor
D1Brentwood Local Development SchemeSeptember 2019Brentwood Borough Council
D2

Five Year Housing Land Supply Statement as at 31 March 2019

Main Report | Sites Schedule

January 2020Brentwood Borough Council
D3Housing Action PlanFebruary 2020Brentwood Borough Council
D4Brentwood Monitoring Report: Housing Delivery 2018/19January 2020Brentwood Borough Council


E. Existing Local Plan Documents

ReferenceDocumentDateAuthor
E1

Brentwood Replacement Local Plan

Local Plan | Main Proposals Map | Inset Map 1 | Inset Map 2 | Inset Maps 3-13

August 2005Brentwood Borough Council
E2Saved Policies DirectionJuly 2008Government Office for the East of England
E3

Conservation Area Boundary Change Consultation Reports

Brentwood and Ingatestone (January 2010) | Great Warley and Herongate (October 2012) | Fryerning (December 2013)

January 2010 – December 2013Brentwood Borough Council
E4Parking Standards – Design and Good Practice SPDSeptember 2009Essex County Council
E5Shopfront Guidance for Brentwood Town Centre SPDMarch 2010Essex Design Initiative
E6Urban Place Supplement SPDMarch 2007Essex County Council
E7Developers’ Guide to Infrastructure ContributionsMarch 2016Essex County Council
E8Sustainable Drainage Systems Design GuideDecember 2014Essex County Council

Breadcrumb, my location

Document Library

 

A. Core Submission Documents

ReferenceDocumentDateAuthor
A1Brentwood Pre Submission Local PlanFebruary 2019Brentwood Borough Council
A2Addendum of Focussed Changes to the Pre Submission Local PlanOctober 2019Brentwood Borough Council
A3Sustainability Appraisal of the Pre Submission Local PlanJanuary 2019Aecom
A4Sustainability Appraisal of the Addendum of Focussed Changes to the Pre Submission Local PlanOctober 2019Aecom
A5Habitats Regulations Assessment of the Brentwood Pre Submission Local PlanJanuary 2019Aecom
A6Habitats Regulations Assessment of the Addendum of Focussed Changes to the Pre Submission Local PlanOctober 2019Aecom
A7

Consultation Statement for the Brentwood Pre Submission Local Plan Regulation 22(c) Statement

Main Report | Annex B | Annex C | Annex D | Annex E | Annex F | Annex G | Annex H | Annex I

February 2020Brentwood Borough Council
A8Proposed Changes to Policies MapFebruary 2020Brentwood Borough Council
A9Equalities Impact AssessmentFebruary 2020Brentwood Borough Council
A10Health Impact AssessmentFebruary 2020Brentwood Borough Council
A11Duty to Cooperate StatementFebruary 2020Brentwood Borough Council
A12

Representations on the Brentwood Pre Submission Local Plan

Further details on representations can be viewed on the Consultation Portal

February 2020Brentwood Borough Council
A13

Representations on the Addendum of Focussed Changes to the Pre Submission Local Plan

Further details on representations can be viewed on the Consultation Portal

February 2020Brentwood Borough Council
A14

Statement of Community Involvement

Part 1 | Part 2

December 2018Brentwood Borough Council
A15Formal request for consideration of modificationsFebruary 2020Brentwood Borough Council

 

B. Previous Stages

ReferenceDocumentDateAuthor
 Regulation 18 Brentwood Core Strategy Issues and Options  
B1Core Strategy Issues and OptionsNovember 2009Brentwood Borough Council
B2Core Strategy Issues and Options Sustainability AppraisalNovember 2009Scott Wilson
 Regulation 18 Brentwood Local Plan Preferred Options  
B3Brentwood Local Plan 2015-2030 Preferred OptionsJuly 2013Brentwood Borough Council
B4

Preferred Options Supporting Documents

Draft Policies Map | Individual Site Allocations

July 2013Brentwood Borough Council
B5Sustainability Appraisal (SA) of the Brentwood Borough Local Plan: Interim SA ReportAugust 2013URS
B6Sustainability Appraisal (SA) of the Brentwood Borough Local Plan: Scoping ReportAugust 2013URS
 Regulation 18 Brentwood Strategic Growth Options  
B7Strategic Growth Options ConsultationJanuary 2015Brentwood Borough Council
B8Sustainability Appraisal (SA) of the Brentwood Borough Local Plan: Interim SA ReportJanuary 2015URS
 Regulation 18 Brentwood Draft Local Plan  
B9Brentwood Draft Local PlanJanuary 2016Brentwood Borough Council
B10

Draft Plan Supporting Documents

Pattern Book | Site Allocations Maps

January 2016Brentwood Borough Council
B11Draft Local Plan Interim Sustainability AppraisalFebruary 2016Aecom
 Regulation 18 Brentwood Draft Local Plan Preferred Site Allocations  
B12Brentwood Draft Local Plan: Preferred Site AllocationsJanuary 2018Brentwood Borough Council
B13Draft Local Plan: Preferred Site Allocations Interim Sustainability AppraisalJanuary 2018Aecom
B14

Habitats Regulations Assessment of Draft Local Plan: Preferred Site Allocations

Main Report | Figure B1 | Figure B2

January 2018Aecom
 Regulation 19 Brentwood Pre-Submission Local Plan  
B15Statement of Representations Procedure and Availability of DocumentsFebruary 2019Brentwood Borough Council

 

C. Evidence

ReferenceDocumentDateAuthor
 Borough Profile  
C1Brentwood Borough ProfileFebruary 2019Brentwood Borough Council
 Culture, Tourism and Leisure  
C2Green Infrastructure StrategySeptember 2015Groundwork South
C3Built Facilities Strategy Full AnalysisOctober 20184global Consulting
C4Playing Pitch Strategy 2018-2033November 20184global Consulting
C5Golf course needs assessmentOctober 2018Brentwood Borough Council
C6

Open space, sport and leisure needs assessment

Final report | Appendices | Appendix 12

August 2016Ploszajski Lynch Consulting Ltd
C7Hotel and Visitor Accommodation Futures StudyApril 2008Hotel Solutions
 Design  
C8Brentwood Town Centre Design GuideNovember 2019Levitt Bernstein
C9

Brentwood Town Centre Design Plan and Feasibility Studies

Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Appendix A | Appendix B

November 2017Levitt Bernstein
C10Brentwood Town Centre Regeneration StrategyMay 2010The Essex Design Initiative
C11Dunton Hills Garden Village Day in the Life ScenariosFebruary 2020Brentwood Borough Council
 Economy and Employment  
C12Economic Futures 2013-2033January 2018Lichfields
C13

Employment Land Review

Final Report | Business Survey | Map A1 | Map A2 | Map A7 | Map A8 | Map A9 | Map A10 | Table E1 | Table E2 | Table E3 | Table E4 | Table E5 | Table E6 | Table E7 | Table F2 | Map of Brentwood

September 2010Atkins
C14

Retail and Commercial Leisure Study

Final Report | Executive Summary

December 2014Nathaniel Lichfield & Partners
 Flooding  
C15

Surface Water Management Plan

Final Report | Executive Summary | Appendix B | Appendix C | Appendix D | Appendix E | Appendix F | Appendix G | Appendix H | Appendix I | Appendix J | Appendix K

January 2015Essex County Council
C16

Strategic Flood Risk Assessment

Main report | Appendix A | Appendix B | Appendix C | Appendix D | Appendix E

November 2018Amec Foster Wheeler
C17Water Cycle StudyNovember 2018Amec Foster Wheeler
 Green Belt  
C18

Green Belt Study

Part 1 London Metropolitan Green Belt overview | Part 2 Green Belt parcel definition and review | Part 3 Assessment of potential housing, employment and mixed use sites | Part 3 Appendix L1, Part 3 Appendix L2 | Part 3 Appendix L3 | Part 3 Appendix L4 | Part 3 Appendix L5 | Part 3 Appendix L6 | Part 3 Appendix L7 | Part 3 Appendix L8

November 2018Crestwood Environmental Ltd
 Housing and Demography  
C19Strategic Housing Market Assessment (SHMA) Part 1October 2018Peter Brett Associates
C20Strategic Housing Market Assessment (SHMA) Part 2 Objectively Assessed Need for Affordable HousingJune 2016HDH Planning and Development Ltd
C21

Greater Essex Demographic Forecasts 2012-2037

Phases 1 and 2 (March 2012) | Phase 3 (July 2012) | Phase 4 (January 2013) | Phase 5 (April 2014) | Phase 6 (September 2014) | Phase 7 (May 2015)

March 2012 – May 2015Edge Analytics
C22Heart of Essex Housing Growth ScenariosJune 2012Edge Analytics
C23

Brentwood Gypsy and Traveller Accommodation Assessment (GTAA)

Original Report | Updated Report

October 2017Opinion Research Services
C24Housing and Economic Land Availability Assessment (HELAA)October 2018Brentwood Borough Council
C25

Site Assessment Methodology and Summary of Outcomes

Main Report | Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8

January 2018Brentwood Borough Council
C26Site Analysis overviewFebruary 2019Brentwood Borough Council
C27

Strategic Housing Land Availability Assessment (SHLAA)

Final Report | Map south east | Map south west | Map central east | Map central west | Map north east | Map north west | Map Brentwood town north west | Map Brentwood town north east | Map Brentwood town south east | Map Brentwood town south west | Map Ingatestone | Map West Horndon | Map Blackmore | Map Doddinghurst | Map Herongate and Ingrave | Map Hook End & Wyatts Green | Map Kelvedon Hatch | Map Pilgrims Hatch | Map Stondon Massey and Tipps Cross

October 2011Atkins
 Infrastructure  
C28

Infrastructure Delivery Plan

0. Control Sheet | 1. Introduction | 2. Development Typology | 3. Transport | 4. Energy | 5. Water and Drainage | 6. Waste | 7. Broadband and Mobile Technology | 8. Education | 9. Social and Community | 10. Health | 11. Sport | 12. Heritage | 13. Emergency Services | 14. Green Infrastructure | 15. Overcoming the Funding Gap | Part B Schedule

February 2020Brentwood Borough Council
 Natural Environment  
C29Protected Lanes AssessmentMarch 2016Place Services
C30Protected Lanes Assessment review letterOctober 2018Place Services
C31

Local Wildlife Site Review

Final Report | Annex

December 2012Essex Ecology Services Ltd
C32

Landscape Sensitivity and Capacity Study

Main report | Appendix L1 | Appendix L2 | Appendix L3 | Appendix L4 | Appendix L5 | Appendix L6 | Appendix L7

October 2018Crestwood Environmental Ltd
C33

Mid Essex Landscape Character Assessment

Contents, preface and executive summary | Introduction | Overview of the study area | Braintree | Brentwood | Chelmsford | Maldon | Uttlesford | Recommendations

September 2006Chris Blandford Associates
 Renewable Energy  
C34

Renewable Energy Study

Final Report | Executive Summary

April 2014University of Exeter
 Transport  
C35

Transport Assessment

Main report | Appendix A | Appendix B | Appendix C | Appendix D | Appendix E | Appendix F | Appendix G | Appendix H | Appendix I | Appendix J | Appendix K

January 2020Stantec
C36Brentwood Borough Cycling Action PlanMarch 2018Essex Highways
C37South Brentwood Growth Corridor Sustainable Transport VisionFebruary 2020DUP
 Viability  
C38Local Plan Viability AssessmentOctober 2018HDH Planning and Development

 

D. Monitoring and Local Development Scheme

ReferenceDocumentDateAuthor
D1Brentwood Local Development SchemeSeptember 2019Brentwood Borough Council
D2

Five Year Housing Land Supply Statement as at 31 March 2019

Main Report | Sites Schedule

January 2020Brentwood Borough Council
D3Housing Action PlanFebruary 2020Brentwood Borough Council
D4Brentwood Monitoring Report: Housing Delivery 2018/19January 2020Brentwood Borough Council


E. Existing Local Plan Documents

ReferenceDocumentDateAuthor
E1

Brentwood Replacement Local Plan

Local Plan | Main Proposals Map | Inset Map 1 | Inset Map 2 | Inset Maps 3-13

August 2005Brentwood Borough Council
E2Saved Policies DirectionJuly 2008Government Office for the East of England
E3

Conservation Area Boundary Change Consultation Reports

Brentwood and Ingatestone (January 2010) | Great Warley and Herongate (October 2012) | Fryerning (December 2013)

January 2010 – December 2013Brentwood Borough Council
E4Parking Standards – Design and Good Practice SPDSeptember 2009Essex County Council
E5Shopfront Guidance for Brentwood Town Centre SPDMarch 2010Essex Design Initiative
E6Urban Place Supplement SPDMarch 2007Essex County Council
E7Developers’ Guide to Infrastructure ContributionsMarch 2016Essex County Council
E8Sustainable Drainage Systems Design GuideDecember 2014Essex County Council