Site inspections

From Monday 8 June 2020 we will be undertaking site inspections where works can be viewed externally. To arrange a visit please contact the contact centre on 01277 312500. Please note if the inspection requires our surveyors to enter a property or view works internally we will be unable to book this and would ask that photos are emailed in to buildingsurveying@brentwood.gov.uk. If the visit is for a completion inspection we will not be able to accept photos and a visit will need to be booked once we are able to carry out internal site inspections. If you are in urgent need of a completion certificate for mortgage purposes please email us using the above email address explaining your current situation.  

Please note if a visit is booked then strict social distancing must be enforced otherwise the surveyor will be unable to carry out the inspection.

 

Site inspections are carried out by a Building Control Surveyor at a number of stages during the building process. This is so we can establish that the requirements of the Building Regulations have been met and will also enable a completion certificate to be issued on satisfactory completion of the project.

Notifications of inspections can be made in advance of the day the inspection is required, or prior to 10.00am if you require a same day inspection.

The stages of notification that will be required, subject to nature of the project, are:-

1.   Commencement of work

2.   Excavations/Preparation of designed foundations prior to concreting

3.   Oversite preparation/designed ground floor construction

4.   Drainage prior to backfilling

5.   Damp proof course (walls)

6.   Damp proof membrane (floor)

7.   Construction of upper floors

8.   Structural beams and columns prior to encasement

9.   Roof construction

10. Insulation

11. Testing of foul drainage and sanitary pipe work (when requested)

12. Completion

More than one inspection may be carried out at one visit, and the surveyor will be able to advise when the next inspection is required whilst on site.

You should be aware that if a person fails to give the necessary notification for an inspection they may be required to open/pull down works which prevent us from ascertaining whether any of the Regulations have been contravened.

If you have any doubts or enquires regarding when inspection notifications are required please telephone 01277 312500.

Breadcrumb, my location

Site inspections

From Monday 8 June 2020 we will be undertaking site inspections where works can be viewed externally. To arrange a visit please contact the contact centre on 01277 312500. Please note if the inspection requires our surveyors to enter a property or view works internally we will be unable to book this and would ask that photos are emailed in to buildingsurveying@brentwood.gov.uk. If the visit is for a completion inspection we will not be able to accept photos and a visit will need to be booked once we are able to carry out internal site inspections. If you are in urgent need of a completion certificate for mortgage purposes please email us using the above email address explaining your current situation.  

Please note if a visit is booked then strict social distancing must be enforced otherwise the surveyor will be unable to carry out the inspection.

 

Site inspections are carried out by a Building Control Surveyor at a number of stages during the building process. This is so we can establish that the requirements of the Building Regulations have been met and will also enable a completion certificate to be issued on satisfactory completion of the project.

Notifications of inspections can be made in advance of the day the inspection is required, or prior to 10.00am if you require a same day inspection.

The stages of notification that will be required, subject to nature of the project, are:-

1.   Commencement of work

2.   Excavations/Preparation of designed foundations prior to concreting

3.   Oversite preparation/designed ground floor construction

4.   Drainage prior to backfilling

5.   Damp proof course (walls)

6.   Damp proof membrane (floor)

7.   Construction of upper floors

8.   Structural beams and columns prior to encasement

9.   Roof construction

10. Insulation

11. Testing of foul drainage and sanitary pipe work (when requested)

12. Completion

More than one inspection may be carried out at one visit, and the surveyor will be able to advise when the next inspection is required whilst on site.

You should be aware that if a person fails to give the necessary notification for an inspection they may be required to open/pull down works which prevent us from ascertaining whether any of the Regulations have been contravened.

If you have any doubts or enquires regarding when inspection notifications are required please telephone 01277 312500.